| Project Description: |
DUDLEY- BRIDGE REPLACEMENTS, D-12-002, LOWER PERRYVILLE RD OVER CANAL & D-12-003, LOWER PERRYVILLE RD OVER PERRYVILLE CHANNEL
The proposed project entails the replacements of both the Perryville Road Bridge and the Lower Perryville Road Bridge over the French River Canal. Included in this project are minor roadway approach widening, drainage improvements, landscaping, guardrail, curbing, and sediment controls for the French River.
|
| Location: |
|
| Project Manager: | Michael O'Dowd![]() |
| Estimated Total Contract Cost: | $1,865,111.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||