Project Description: |
SOMERVILLE- BRIDGE REPLACEMENTS, BR# S-17-011, LOWELL STREET OVER THE MBTA & B&M R.R. & S-17-015 LOWELL OVER THE MBTA AND B&MRR
The work consists of the demolition and the replacement of 2 bridges on Lowell Street over the MBTA and the B&M Rail Road. Existing abutments will be modified to accommodate the new bridges. A parapet wall and protective screen will be constructed on both sides of the bridges and the full length of the road between the two bridges.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Michael-kosmas Bloukos |
Estimated Total Contract Cost: | $2,507,230.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|