Project Description: |
SOMERVILLE- BRIDGE REPLACEMENTS, BR# S-17-011, LOWELL STREET OVER THE MBTA & B&M R.R. & S-17-015 LOWELL OVER THE MBTA AND B&MRR
The work consists of the demolition and the replacement of 2 bridges on Lowell Street over the MBTA and the B&M Rail Road. Existing abutments will be modified to accommodate the new bridges. A parapet wall and protective screen will be constructed on both sides of the bridges and the full length of the road between the two bridges.
|
Location: |
|
Resident Engineer: | Harry Thompson Iii |
Construction Contract Value: | $2,507,230.00 |
Construction Bid Price: | $2,175,991.00 |
Initial Construction Estimate: | $1,801,447.00 |
District: | District 4 |
Current Status: | This project is complete (as of 09/06/2006) |
|
Bridges
|
|
|
|
|