| Project Description: |
BROCKTON- ROADWAY RECONSTRUCTION, BELMONT ST. (RT.123) @ PEARL ST; NORTH PEARL ST. (RT.27) @ OAK ST.; OAK ST. @ RESERVOIR ST.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Other |
| Project Manager: | Martin Leelman![]() |
| Estimated Total Contract Cost: | $1,926,637.82 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||