Project Description: |
BOSTON- TRAFFIC SIGNAL CONTROLLER AND CABINET UPGRADES AT 120 LOCATIONS
|
Location: |
|
Resident Engineer: | Ahmad Ilyas |
Construction Contract Value: | $2,793,128.04 |
Initial Construction Estimate: | $2,607,024.00 |
District: | District 4 |
Current Status: | This project is substansially complete. 10 Intersections remain for final acceptance, six of which just require NStar Connection. (as of 08/24/2006) |
|
Bridges |
|
|
|
|