| Project Description: |
BOSTON- TRAFFIC SIGNAL CONTROLLER AND CABINET UPGRADES AT 120 LOCATIONS
|
| Location: |
|
| Resident Engineer: | Ahmad Ilyas![]() |
| Construction Contract Value: | $2,793,128.04 |
| Initial Construction Estimate: | $2,607,024.00 |
| District: | District 4 |
| Current Status: | This project is substansially complete. 10 Intersections remain for final acceptance, six of which just require NStar Connection. (as of 08/24/2006) |
|