Project Description: |
HAVERHILL- RECONSTRUCTION OF ROUTE 125 (SOUTH MAIN ST), FROM BOSTON ROAD TO BASILIERE BRIDGE & SALEM STREET, FROM SOUTH MAIN STREET TO PEABODY STREET
The work consists of modifications to the horizontal and vertical alignment, installation of new and upgrades of existing traffic signals, drainage improvements, full depth pavement widening, granite curb, cement concrete sidewalk, signing, striping and restorative landscaping.
|
Location: |
|
Resident Engineer: | Michael Sherwood |
Construction Contract Value: | $13,171,386.00 |
Construction Bid Price: | $13,075,663.55 |
Initial Construction Estimate: | $14,644,110.00 |
District: | District 4 |
|