TEMPLETON- RECONSTRUCTION OF ROUTE 202, FROM PHILLIPSTON T.L. TO WINCHENDON T.L.
The work to be done consists of full depth reconstruction and cold planing Route 202 in the Town of Templeton. The project begins at the Templeton-Phillipston Town Line and runs in a northeasterly direction for 2.3 miles, to the intersection of Route 202 and Route 68 North. This section will be reconstructed full depth. The intersection of Route 202 and Route 2A will be reconstructed and a new alignment will be created so that Route 2A intersects Route 202 at a 90 degree angle. Route 202 will be widened in this section to accommodate a left turn only lane. The project then continues in a northeasterly direction for 1.2 miles, through the center of Templeton (including 1500 feet of Town-owned roadway), then continues 1 mile to the Winchendon-Templeton Town Line. This section includes cold planing and resurfacing with hot mix asphalt pavement. The total length of the project is approximately 4.8 miles. Additional work includes but is not limited to the reconstruction and replacement of drainage structures and culverts, resurfacing of a portion of sidewalk, installation of wheelchair ramps, and wetland replication.
Location:
  • Town of Templeton
  • Resident Engineer: Ralph Romano
    Construction Contract Value: $4,341,128.00
    Construction Bid Price: $3,755,025.50
    Initial Construction Estimate: $4,204,008.00
    District: District 2

    Contracts (1) Progress
    # 52390 -- Construction Contract
    Work consists of full depth reconstruction and cold planing Route 202 in the Town of Templeton. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 11/07/2007
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 04/11/1995
    Project Status Advertised 07/01/2006
    Project Management
    Final Design PS&E Received 03/09/2006
    Final Design PS&E to FAPRO 03/09/2006