Project Description:
HADLEY- NORTHAMPTON- RECONSTRUCTION OF ROUTE 9 (RUSSELL STREET)
The reconstruction project begins at Aqua Vitae Road and proceeds easterly to Whalley Street for a total distance of approximately 1.1 miles. The existing roadway varies in width from 35 to 45 feet. The proposed roadway will consist of two 12-foot travel lanes, two 11½-foot travel lanes and 2½-foot paved shoulders, for a total roadway width of 52 feet. In addition, an 11-foot left turn lane will be provided at the Bay Road intersection. Additional proposed improvements include concrete wheelchair ramps and sidewalks, new traffic signals at Bay Road, waterworks and drainage improvements, vegetated swales; asphalt berms, granite curbing and edging.
Location:
  • Town of Hadley
  • City of Northampton
  • Resident Engineer: Joseph Gadbois
    Construction Contract Value: $4,266,913.00
    Construction Bid Price: $4,040,513.00
    Initial Construction Estimate: $3,927,704.00
    District: District 2
    Current Status: Road under construction (as of 03/31/2005)
    Additional Info: Daily lane restrictions/reductions during the work week. All lanes open at end of work day and weekends. (as of 05/14/2007)

    Contracts (1) Progress
    # 37005 -- Construction Contract
    Roadway improvements for Route 9 in the Town of Hadley. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 01/07/2005
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Road under construction
    Additional Info
    Daily lane restrictions/reductions during the work week. All lanes open at end of work day and weekends.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 12/17/1992
    Project Review Committee PRC Approved 11/24/1992
    Project Status Advertised 06/26/2004
    Project Status Advertised 11/06/2004
    Project Management
    Final Design PS&E Received 10/10/2003
    Final Design PS&E to FAPRO 10/10/2003