Project Description: |
HOLDEN- ROADWAY RECONSTRUCTION ON MAIN STREET (ROUTE 122A) FROM THE ROUTE 122A/ROUTE 31 INTERSECTION TO SHREWSBURY ST.
The project primarily consists of resurfacing and extensive areas of full depth reconstruction. Traffic signals will be upgraded with a new signal being proposed at the industrial park. The proposed roadway will consist of two 12 foot travel lanes, 10 foot shoulders and 5 foot sidewalks on both sides.
|
Location: |
|
Resident Engineer: | Dennis Manseau |
Construction Contract Value: | $5,598,362.50 |
Construction Bid Price: | $4,137,000.00 |
Initial Construction Estimate: | $3,836,000.00 |
District: | District 3 |
|
Bridges |
|
|
|
|