Project Description: |
HOLDEN- ROADWAY RECONSTRUCTION ON MAIN STREET (ROUTE 122A) FROM THE ROUTE 122A/ROUTE 31 INTERSECTION TO SHREWSBURY ST.
The project primarily consists of resurfacing and extensive areas of full depth reconstruction. Traffic signals will be upgraded with a new signal being proposed at the industrial park. The proposed roadway will consist of two 12 foot travel lanes, 10 foot shoulders and 5 foot sidewalks on both sides.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Other |
Project Manager: | Marie Joyce Rose![]() |
Estimated Total Contract Cost: | $5,598,362.50 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|