Project Description:
HOLDEN- ROADWAY RECONSTRUCTION ON MAIN STREET (ROUTE 122A) FROM THE ROUTE 122A/ROUTE 31 INTERSECTION TO SHREWSBURY ST.
The project primarily consists of resurfacing and extensive areas of full depth reconstruction. Traffic signals will be upgraded with a new signal being proposed at the industrial park. The proposed roadway will consist of two 12 foot travel lanes, 10 foot shoulders and 5 foot sidewalks on both sides.
Location:
  • Town of Holden
  • Design Responsibility: Municipality
    Right of Way Responsibility: Other
    Project Manager: Marie Joyce Rose
    Estimated Total Contract Cost: $5,598,362.50
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project