Project Description:
BROCKTON- RESURFACING & RELATED WORK ON A SECTION OF ROUTE 27 (PLEASANT STREET & CRESCENT STREET)
This project consists of roadway and intersection improvements along Pleasant Street from the intersection with West Street easterly to the intersection with North Main Street, Main Street and Court Street (approx. 6,211 feet). The proposed roadway, geometric, and traffic control improvements are intended to improve vehicular, bicyclist and pedestrian safety as well as vehicular capacity and traffic operations within the project limits. The proposed design of Pleasant Street will require, but is not limited to: cold plane and overlaying, isolated full-depth pavement widening, removing and resetting of granite curb or installation of new granite curb; sidewalk installation or reconstruction; installation of fully actuated and coordinated traffic signal systems, reconstruction of existing traffic signals, and improved signing and pavement markings.
Location:
  • City of Brockton
  • Resident Engineer: Kenneth Belgrave
    Construction Contract Value: $4,180,956.39
    Construction Bid Price: $3,270,489.75
    Initial Construction Estimate: $3,511,608.00
    District: District 5

    Contracts (2) Progress
    # 57726 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final
    # 75493 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Traffic Signals) on Sections of Route 27 (Crescent Street). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 12/14/2012
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 09/30/1993
    Project Status Initiated 11/17/2005
    Project Status Advertised 08/18/2012
    Project Management
    100% Design 100% Package Received 05/16/2011
    100% Design 100% Package Comments to DE 09/30/2011
    25% Design 25% Package Received 02/26/2008
    25% Design 25% Package Comments to DE 09/22/2008
    25% Design Design Public Hearing 11/19/2008
    75% Design 75% Package Received 02/18/2010
    75% Design 75% Package Comments to DE 01/25/2011
    Final Design PS&E Received 05/23/2012
    Final Design PS&E to FAPRO 08/15/2012