RAYNHAM- RESURFACING AND RELATED WORK, SOUTH MAIN STREET (ROUTE 104)
The proposed work along Route 104 in the Town of Raynham begins from the corporate boundary with the City of Taunton to the North Main Street/Orchard Street/Pleasant Street intersection. The proposed work on South Main Street consists of cold planing and overlay of the existing pavement surface, as well as the installation of new granite curb and sidewalks on both sides of the roadway, and drainage modifications. The total length of the project is 1.6 miles.
|