| Project Description: |
KINGSTON- RECONSTRUCTION OF ROUTE 27 (PEMBROKE STREET)
The proposed project will maintain and improve the existing roadway from the Pembroke Town line to just short of the intersection of Evergreen Street, a distance of 3.3 miles. Traffic will be allowed during construction. Included is minor widening, a new drainage system, new sidewalk, guardrail installation, pavement markings, new traffic signals, landscaping and new signage.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Albert Miller![]() |
| Estimated Total Contract Cost: | $10,538,012.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|