Project Description:
PLYMOUTH- RECONSTRUCTION OF ROUTE 44 (SAMOSET STREET) FROM ROUTE 3 (NB RAMP) EASTERLY TO WATER STREET
The project entails the reconstruction of Samoset Street (Route 44) from the northbound Route 3 interchange to Court Street (Route 3A) as well as North and South Park Streets from Route 3A to Water Street. The reconstruction will provide fully ADA compliant sidewalks and wheelchairs ramps, bike friendly shoulders and improvements to the existing vertical profile and drainage system. The current design will largely be completed within the 41 foot right of way and consists of 11 foot travel lanes, 4 foot shoulders and 5.5 foot sidewalks along both sides of the road.
Location:
  • Town of Plymouth
  • Resident Engineer: Daniel Mastrangelo
    Construction Contract Value: $4,097,145.00
    Construction Bid Price: $3,561,465.00
    Initial Construction Estimate: $3,722,586.09
    District: District 5

    Contracts (3) Progress
    # 64315 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 68940 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design services to MassDOT on a task order basis for Layout and Right of Way assignments. Final
    # 79295 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Traffic Signals) along a Section of Route 44 (Samoset Street). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 04/22/2014
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 10/22/1993
    Project Review Committee Letter 02/23/2009
    Project Review Committee Resubmitted 01/23/2009
    Project Status Initiated 11/16/2005
    Project Status Advertised 08/17/2013
    Project Management
    100% Design 100% Package Received 04/17/2013
    100% Design 100% Package Comments to DE 06/14/2013
    25% Design 25% Package Received 05/22/2009
    25% Design 25% Package Comments to DE 09/02/2010
    25% Design 25% Package Approved 02/14/2011
    25% Design Design Public Hearing 04/11/2011
    75% Design 75% Package Received 07/10/2012
    75% Design 75% Package Comments to DE 12/19/2012
    Final Design PS&E Received 06/28/2013
    Final Design PS&E to FAPRO 08/13/2013