ARLINGTON- BRIDGE REPLACEMENT, BR# A-10-011 ROUTE 2 OVER THE MINUTEMAN BIKEWAY
The project consists of the replacement of Route 2 over the Minuteman Commuter Bikeway Bridge with a single span 118’ long concrete structure. This project was designed to be compatible with the large concrete visual elements of the Alewife complex and consistent with the architectural themes found in the Minuteman Commuter Bikeway Corridor. The single span bridge type and the lighting provided underneath the bridge were incorporated in response to the results of a public safety evaluation conducted in the beginning of the project.
Location:
  • Town of Arlington
  • Design Responsibility: Consultant
    Right of Way Responsibility: Other
    Project Manager: Steven E McLaughlin
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project has been advertised for construction bids. (as of 08/12/2000 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Status Advertised 08/12/2000