Project Description: |
WARREN- BRIDGE REHABILITATION, BR# W-07-006 GILBERT ROAD OVER THE QUABOG RIVER
The proposed project includes the historical rehabilitation of the bridge with minor incidental roadway work. The proposed rehabilitation of this structure will require closing the bridge to traffic with a signed detour in place. Included in this project are guardrail, curbing and sediment controls for the Quaboag River.
|
Location: |
|
Resident Engineer: | Stefan Toth |
Construction Contract Value: | $601,620.00 |
Construction Bid Price: | $536,018.50 |
Initial Construction Estimate: | $393,907.00 |
District: | District 2 |
Current Status: | Bridge under construction (as of 11/08/2005) |
Additional Info: | Bridge opened to traffic. (as of 05/30/2008) |
|
Bridges
|
|
|
|
|