| Project Description: |
CHARLEMONT- BRIDGE REHABILITATION, C-05-005, ROUTE 8A (NORTH HEATH ROAD) OVER MILL BROOK (BISSELL BRIDGE)
The scope of work for the design contract consists of rehabilitating the existing bridge while maintaining its historic characteristics, adding crash tested bridge rail and upgrading live loads to meeting applicable load requirements.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Michael Papadopoulos![]() |
| Estimated Total Contract Cost: | $3,068,508.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||