Project Description:
CHARLEMONT- BRIDGE REHABILITATION, C-05-005, ROUTE 8A (NORTH HEATH ROAD) OVER MILL BROOK (BISSELL BRIDGE)
The scope of work for the design contract consists of rehabilitating the existing bridge while maintaining its historic characteristics, adding crash tested bridge rail and upgrading live loads to meeting applicable load requirements.
Location:
  • Town of Charlemont
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: Michael Papadopoulos
    Estimated Total Contract Cost: $3,068,508.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • C05005 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project