| Project Description: |
CONCORD- BRIDGE REPLACEMENT, C-19-019, PINE STREET OVER THE ASSABET RIVER
The proposed bridge reconstruction will incorporate a new water main and will be built on its existing location. A detour will be in place for pedestrians and vehicles for the duration of the construction. This proposed project includes new guardrail, curbing and sediment controls for the Assabet River.
|
| Location: |
|
| Resident Engineer: | Gennady Shkolnikov![]() |
| Construction Contract Value: | $1,756,011.61 |
| Construction Bid Price: | $1,198,976.00 |
| Initial Construction Estimate: | $1,128,570.00 |
| District: | District 4 |
|