| Project Description: |
CONCORD- BRIDGE REPLACEMENT, C-19-019, PINE STREET OVER THE ASSABET RIVER
The proposed bridge reconstruction will incorporate a new water main and will be built on its existing location. A detour will be in place for pedestrians and vehicles for the duration of the construction. This proposed project includes new guardrail, curbing and sediment controls for the Assabet River.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Albert Miller![]() |
| Estimated Total Contract Cost: | $1,756,011.61 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|