Project Description: |
MEDFIELD- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 27 (NORTH MEADOWS ROAD)
This project consists of cold planing and resurfacing Route 27 from the intersection at Route 109 heading northerly to the Sherborn town line. This project also includes incidental work such as placing berm along the roadway edges, adjusting guardrail and applying the traffic markings.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Other |
Project Manager: | Albert Li |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 10/19/2002 ) |
|
Bridges |
|
|
|