Project Description:
LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95/ROUTE 128 (DESIGN-BUILD)
The purpose of this project is to replace the Route 2 Bridges over I-95/Route 128 in both directions. Each bridge deck will accommodate three 12 foot travel lanes, one 12 foot auxiliary lane and offsets to the bridge curbing. Multi-staged construction will be required to maintain existing traffic on Route 2 and I-95/Route 128.
Location:
  • Town of Lexington
  • Construction Begins: Spring 2014
    Resident Engineer: Greg Kwon
    Construction Contract Value: $59,567,496.00
    Construction Bid Price: $50,328,500.00
    Initial Construction Estimate: $38,900,000.00
    District: District 4

    Contracts (6) Progress
    # 57731 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final
    # 64324 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 76262 -- Non-system contract type
    Perform various assignments as the Owner's Representative for the peer review of engineering elements associated with satewide construction projects.
    # 76862 -- Construction Contract
    Bridge Replacement (L-10-009) (Steel) - Route 2 (EB & WB) over Interstate 95 (Route 128). DESIGN / BUILD Completed
    # 77870 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 80650 -- Non-system contract type
    Statewide - Owner's Representative Will perform peer rewiews and manage cost recovery and value engineering for various projects

    Bridges

    Contract Dates
    Notice to Proceed: 04/22/2014
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 03/10/2006
    Project Review Committee PRC Approved 03/08/1994
    Project Status Advertised 08/17/2013
    Project Management
    25% Design 25% Package Received 01/10/2011
    25% Design 25% Package Received 05/23/2012
    25% Design 25% Package Received 02/12/2013
    25% Design 25% Package Comments to DE 02/25/2013
    25% Design 25% Package Comments to DE 06/12/2013
    25% Design Design Public Hearing 02/12/2013
    Final Design PS&E to FAPRO 08/14/2013
    Consultant Contract Process Scope to DE 08/25/2006
    Consultant Contract Process NTP Issued 09/19/2008
    Consultant Contract Process Workhours Approved 06/27/2007