Project Description: |
BOSTON- BRIDGE REHABILITATION, BR# B-16-401, IPSWICH STREET OVER THE MUDDY RIVER
The proposed project is located on Ipswich Street between the Bowker Overpass and Charlesgate East. The purpose of the project is to replace the existing bridge deck spanning the Muddy River. The project also includes the roadway reconstruction of approximately 156 feet west of the existing bridge and 100 feet east of the existing bridge.
|
Location: |
|
Resident Engineer: | Michael Cameron |
Construction Contract Value: | $1,557,262.00 |
Construction Bid Price: | $971,087.00 |
Initial Construction Estimate: | $820,053.00 |
District: | District 4 |
|