| Project Description: |
CHESHIRE- BRIDGE REPLACEMENT, BR# C-10-006 CHURCH STREET OVER THE HOOSIC RIVER
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Other |
| Project Manager: | Paul Pascucci![]() |
| Estimated Total Contract Cost: | $387,445.30 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||