Project Description: |
COLRAIN- BRIDGE REHABILITATION, BR# C-18-001 FRANKLIN ROAD OVER THE EAST BRANCH OF THE NORTH RIVER
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Robert Miot |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 1 |
Current Status: | This project has been advertised for construction bids. (as of 01/10/1998 ) |
|
Bridges
|
|
|
|