| Project Description: |
NORTON- BRIDGE REPLACEMENT, BR# N-23-006 CRANE STREET OVER THE THREE MILE RIVER
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Other |
| Project Manager: | Joseph Mombrun![]() |
| Estimated Total Contract Cost: | $850,014.82 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||