Project Description: |
NORWOOD- SUPERSTRUCTURE REPLACEMENTS, BR# N-25-022 NAHATAN ST. (SOUTH) OVER ROUTE 1 & N-25-023 NAHANTAN ST. (NORTH) OVER ROUTE 1
This project will result in the demolition and replacement of both of the Nahatan Street bridges over Route 1 NB and SB at the same location. The length of the project is approximately 715 feet. Included in this project is the reconstruction of the roadway approaches, new granite curbing and guardrail.
|
Location: |
|
Resident Engineer: | -- not assigned -- |
Construction Contract Value: | $3,721,721.74 |
Construction Bid Price: | $3,433,787.00 |
Initial Construction Estimate: | $4,066,000.00 |
District: | District 5 |
|
Bridges
|
|
|
|
|