Project Description: |
WELLESLEY- BRIDGE REPLACEMENT, W-13-007, ROCKLAND STREET OVER CONRAIL
The new bridge deck will be raised 5.2 inches to provide a 17 foot 9 inch clearance over the RR tracks. The bridge deck will widened by 4 feet to a total of 24.5 feet for vehicles. Two 6 foot sidewalks will also be included.
|
Location: |
|
Resident Engineer: | Daniel Stiven |
Construction Contract Value: | $1,899,174.00 |
Construction Bid Price: | $1,627,682.00 |
Initial Construction Estimate: | $1,792,213.00 |
District: | District 6 |
|