Project Description:
FALL RIVER- SOMERSET- CONSTRUCTION OF APPROACH SPAN SUBSTRUCTURE, BR# F-02-094=S-16-014 BRIGHTMAN ST OVER TAUNTON RIVER (CONTRACT 2)
This is the second of four construction contracts for the Brightman Street bridge replacement project. The work under Contract 2 consists of the construction of piers and abutments and pier protection structures. Included is the construction of reinforced concrete piers and abutments, turbidity screens, pier protection structures, dredging, navigation lights, a mechanically stabilized earth wall, steel piles, and fender bumpers.
Location:
  • City of Fall River
  • Town of Somerset
  • Design Responsibility: Consultant
    Right of Way Responsibility: Other
    Project Manager: Martin Leelman
    Estimated Total Contract Cost: $40,731,867.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • F02094 
    • S16014 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project