Project Description: |
TYNGSBOROUGH- BRIDGE REHABILITATION, T-09-001, ROUTE 113 & 3A OVER THE MERRIMACK RIVER & T-09-002 OVER THE B&M RR
The purpose of this project is to rehabilitate the existing Tyngsborough Bridge. As this bridge will be closed to traffic during the rehabilitation, a temporary bridge, designed and constructed as a separate project, is intended to carry traffic during the rehabilitation work.
|
Location: |
|
Resident Engineer: | Brian Polley |
Construction Contract Value: | $19,034,629.00 |
Construction Bid Price: | $16,394,304.00 |
Initial Construction Estimate: | $17,718,500.00 |
District: | District 4 |
|
Bridges
|
|
|
|
|