FOXBOROUGH- FRANKLIN- MANSFIELD- PLAINVILLE- WRENTHAM- RESURFACING AND RELATED WORK TO A SECTION OF ROUTE I-495
The proposed project consists of resurfacing Route I-495 NB in the Towns of Franklin, Wrentham, Plainville, Foxborough, and Mansfield. The total length of the project is approximately 9.5 miles. Included in the project are the ramps along the Northbound section of Route I-495 at King Street/Franklin, Route 1A/Wrentham, Route 1 in Foxborough and Plainville, and Route I-95 in Foxborough/Mansfield (excluding the ramps from Route I-95 NB to Route I-495 SB, and from Route I-495 NB to Route I-95 NB). Widening will be performed at: Ramp "H" and the acceleration lane on I-495 at the Route 1 interchange in Wrentham and Plainville; Route 1 southbound on the approach to Ramp "H"; and, Route 1 NB at the approach to the intersection with Madison St. in Plainville. The portion of Summer Street in Franklin which is within the State Highway Layout beneath Route I-495 will be also reconstructed.
Location:
  • Town of Foxborough
  • Town of Franklin
  • Town of Mansfield
  • Town of Plainville
  • Town of Wrentham
  • Resident Engineer: Michael Giovanelli
    Construction Contract Value: $18,426,885.00
    Construction Bid Price: $16,785,188.03
    Initial Construction Estimate: $15,049,000.00
    District: District 5

    Contracts (1) Progress
    # 32082 -- Construction Contract
    I-495 CEMENT CONCRETE PAVING Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 12/17/2001
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Interstate Maintenance
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 05/03/1996
    Project Review Committee PRC Approved 08/20/1996
    Project Status Advertised 06/16/2001
    Project Management
    Final Design PS&E Received 06/16/2001