Project Description: |
HOLYOKE- BRIDGE REPLACEMENT, H-21-018, LYMAN STREET OVER FIRST LEVEL CANAL
The purpose of this project is to replace the Lyman Street Bridge over the First Canal. Sidewalks will be included on each side of the proposed bridge.
|
Location: |
|
Construction Begins: | Spring 2019 |
Resident Engineer: | John Dahl |
Construction Bid Price: | $6,594,524.50 |
District: | District 2 |
|