Project Description: |
BARNSTABLE- MASHPEE- BRIDGE REPLACEMENT, BR# B-01-006=M-08-001 SCHOOL STREET OVER SANTUIT RIVER
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Steven E McLaughlin![]() |
Estimated Total Contract Cost: | $698,584.19 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|