Project Description:
FRANKLIN- 3R PROJECT UNION STREET FROM BEAVER ST TO WASHINGTON STREET (1.0 MILE)
The reconstruction of Union Street also includes two concrete sidewalks with granite curbs, wheelchair ramps, geometric and drainage improvements, pavement markings and signs to improve vehicular and pedestrian safety.
Location:
  • Town of Franklin
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Project Manager: Filbert Yee
    Estimated Total Contract Cost: $4,118,879.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information