| Project Description: |
FRANKLIN- 3R PROJECT UNION STREET FROM BEAVER ST TO WASHINGTON STREET (1.0 MILE)
The reconstruction of Union Street also includes two concrete sidewalks with granite curbs, wheelchair ramps, geometric and drainage improvements, pavement markings and signs to improve vehicular and pedestrian safety.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Filbert Yee![]() |
| Estimated Total Contract Cost: | $4,118,879.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|