Project Description: |
FALL RIVER- WESTPORT- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-195 AND RAMPS
This project includes repaving, safety improvements and bridge rehabilitation on the Interstate System. Work also includes geometric improvements to the Route 24SB / I-195EB ramps to extend the acceleration lane on the on-ramp which enters onto the high speed (left ) lane of I-195 EB .
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Albert Li![]() |
Estimated Total Contract Cost: | $4,711,167.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|