Project Description: |
REVERE- INSTALLATION OF CLOSED LOOP TRAFFIC SIGNAL SYSTEM ON ROUTE 107 (BROADWAY) (7 LOCATIONS)
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Other |
Project Manager: | Peter Kutrubes |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project has been advertised for construction bids. (as of 09/25/1999 ) |
|