| Project Description: |
REVERE- INSTALLATION OF CLOSED LOOP TRAFFIC SIGNAL SYSTEM ON ROUTE 107 (BROADWAY) (7 LOCATIONS)
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Other |
| Project Manager: | Peter Kutrubes![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 09/25/1999 ) |
|
Bridges |
||||||
|
|
|
||||||||||||||