Project Description: |
BELCHERTOWN- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT THE MHD MAINTENANCE DEPOT ON ROUTE 9
CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE FACILITY AT THE MHD MAINTENANCE DEPOT ON ROUTE 9
|
Location: |
|
Resident Engineer: | -- not assigned -- |
Construction Contract Value: | $864,446.20 |
Initial Construction Estimate: | $495,005.00 |
District: | District 2 |
Current Status: | Physical Work Completed. (as of 02/17/2005) |
|
Bridges |
|
|
|
|