| Project Description: |
NORTHAMPTON- CONSTRUCTION OF A BIKE PATH ALONG ABANDONED RR BED (EXTENSION OF NORWOTTUCK TRAIL)
This project entails the construction of about a mile bike path from Woodmont Road to Damon Road along an abandoned railroad bed. The work also includes the installation of a pedestrian traffic control signal at Damon Road, and the removal of the existing abandoned railroad bridge over Woodmont Road.
|
| Location: |
|
| Resident Engineer: | Jeffrey Hendricks![]() |
| Construction Contract Value: | $764,508.00 |
| Construction Bid Price: | $615,008.00 |
| Initial Construction Estimate: | $607,368.00 |
| Total Estimated Project Cost: | $730,000.00 |
| District: | District 2 |
| Current Status: | Bike path under construction (as of 05/10/2006) |
|