Project Description: |
NORTHAMPTON- CONSTRUCTION OF A BIKE PATH ALONG ABANDONED RR BED (EXTENSION OF NORWOTTUCK TRAIL)
This project entails the construction of about a mile bike path from Woodmont Road to Damon Road along an abandoned railroad bed. The work also includes the installation of a pedestrian traffic control signal at Damon Road, and the removal of the existing abandoned railroad bridge over Woodmont Road.
|
Location: |
|
Resident Engineer: | Jeffrey Hendricks |
Construction Contract Value: | $764,508.00 |
Construction Bid Price: | $615,008.00 |
Initial Construction Estimate: | $607,368.00 |
Total Estimated Project Cost: | $730,000.00 |
District: | District 2 |
Current Status: | Bike path under construction (as of 05/10/2006) |
|
Bridges |
|
|
|
|