Project Description: |
BERNARDSTON- BRIDGE REHABILITATION, BR# B-10-012, ROUTES 5 & 10 (SOUTH STREET) OVER B&M RR
The new 3-span bridge will provide more clearance for the tops of the trains passing underneath. Both new piers will be built further back than the existing piers to provide more clearance for the sides of trains. The new bridge will have two 12-foot travel lanes, two 11-foot shoulders, and two 6.5-foot sidewalks.
|
Location: |
|
Resident Engineer: | Sean Sullivan |
Construction Contract Value: | $4,745,066.00 |
Construction Bid Price: | $4,597,062.00 |
Initial Construction Estimate: | $3,470,308.45 |
District: | District 2 |
Current Status: | Bridge under construction (as of 05/11/2007) |
Additional Info: | Permanent lane restrictions/reductions for the duration of the project. Alternating one-way traffic controlled by temporary traffic signal. (as of 03/05/2007) |
|