SOUTHBRIDGE- STURBRIDGE- RESURFACING & RELATED WORK ON ROUTE 131 (SOUTHBRIDGE ROAD) FROM ROUTE 20 TO SOUTHBRIDGE TL (2.841 MILES)
Project consists of milling and resurfacing a 2.8 mile section of Route 131 from Route 20 to the Southbridge Town line. A side walk will be added to the westerly side of the road for the entire length of the project. The Town is designing the project.
Location:
  • Town of Southbridge
  • Town of Sturbridge
  • Resident Engineer: Paul Thompson
    Construction Contract Value: $5,598,862.00
    Construction Bid Price: $4,320,239.00
    Initial Construction Estimate: $4,716,248.00
    District: District 3

    Contracts (2) Progress
    # 54827 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 61682 -- Construction Contract
    Resurfacing and Related Work on a Section of Route 131 (Main Street) Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 02/24/2010
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 01/31/1995
    Project Review Committee PRC Approved 02/07/1995
    Project Review Committee PRC Approved 03/09/2006
    Project Review Committee Letter 03/28/2006
    Project Status Initiated 06/07/2005
    Project Status Advertised 09/19/2009
    Project Management
    100% Design 100% Package Received 03/18/2009
    100% Design 100% Package Comments to DE 06/23/2009
    25% Design 25% Package Received 07/28/2006
    25% Design 25% Package Comments to DE 01/05/2007
    25% Design Design Public Hearing 07/19/2007
    75% Design 75% Package Received 11/21/2007
    75% Design 75% Package Comments to DE 02/29/2008
    Final Design PS&E Received 08/14/2009
    Final Design PS&E to FAPRO 09/16/2009