| Project Description: |
SOUTHBRIDGE- STURBRIDGE- RESURFACING & RELATED WORK ON ROUTE 131 (SOUTHBRIDGE ROAD) FROM ROUTE 20 TO SOUTHBRIDGE TL (2.841 MILES)
Project consists of milling and resurfacing a 2.8 mile section of Route 131 from Route 20 to the Southbridge Town line. A side walk will be added to the westerly side of the road for the entire length of the project. The Town is designing the project.
|
| Location: |
|
| Resident Engineer: | Paul Thompson![]() |
| Construction Contract Value: | $5,598,862.00 |
| Construction Bid Price: | $4,320,239.00 |
| Initial Construction Estimate: | $4,716,248.00 |
| District: | District 3 |
|
Bridges |
||||||||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||