Project Description: |
ACUSHNET- NEW BEDFORD- BRIDGE REPLACEMENT, BR# A-03-001=N-06-003 SLOCUM STREET/WOOD STREET OVER THE ACUSHNET RIVER
The scope of work is for the replacement of the Slocum St/Wood St Bridge over the Acushnet River; the approaches from River Street and River Road to the bridge. The proposed bridge will have 2-15.6 ft wide travel lanes, with 2-6.9 FT sidewalks
|
Location: |
|
Resident Engineer: | David Ribeiro |
Construction Contract Value: | $3,028,226.54 |
Construction Bid Price: | $2,494,663.00 |
Initial Construction Estimate: | $1,913,000.00 |
District: | District 5 |
|