Project Description: |
BOSTON- ROADWAY RECONSTRUCTION ON CAMBRIDGE STREET FROM COURT STREET TO WEST CEDAR STREET
This is a roadway reconstruction project which includes adjusting and rebuilding drainage structures, and reconstructing brick and concrete sidewalk with wheelchair ramps.
|
Location: |
|
Resident Engineer: | John Lepore |
Construction Contract Value: | $6,429,208.35 |
Construction Bid Price: | $6,288,089.50 |
Initial Construction Estimate: | $5,824,070.00 |
District: | District 4 |
Current Status: | Punch List work is ongoing on this project. Interconnect cable work , sign work and installation of bike racks. (as of 10/23/2008) |
|