Project Description:
SOUTHWICK- BRIDGE REPLACEMENT, S-22-005, ROUTE 202/ROUTE 10 OVER JOHNSON BROOK
The proposed project consists of the replacement of the bridge which carries U.S. Route 202 and State Route 10 over the Johnson Brook in the same alignment. This replacement will be constructed in three stages. The work will also include improvements to the approach roadway and the relocation of the existing water main.
Location:
  • Town of Southwick
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: James Dalton
    Estimated Total Contract Cost: $2,492,838.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • S22005 
    See the Milestone Details tab for additional Project information