Project Description: |
BROCKTON- RECONSTRUCTION OF WINTER STREET, FROM HOWARD STREET TO NORTH CARY STREET (5,300 FEET - 3R PROJECT)
The proposed project includes pavement reconstruction, with some minor widening with granite curbing, installation of new bituminous concrete sidewalks and wheelchair ramps, minor drainage improvements and utility adjustments and/or relocations, pavement markings and a traffic signal with a pedestrian phase at Howard Street intersection.
|
Location: |
|
Project Manager: | Joseph Mombrun![]() |
Estimated Total Contract Cost: | $2,864,984.72 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|