| Project Description: |
LANCASTER- RESURFACING AND RELATED WORK ON ROUTE 70 (LUNENBURG ROAD) FROM ROUTE 2 TO MM 18.496 (2.25 MILES)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | Brian Haggerty![]() |
| Estimated Total Contract Cost: | $378,772.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||