LEOMINSTER- RESURFACING AND RELATED WORK ON ROUTE 13 (MAIN STREET) FROM LUNENBURG T.L. TO PROSPECT STREET (2.4 MILES)
The work to be done under this contract consists of cold planing and resurfacing Route 13 from the Leominster/Lunenburg town line to approximately Pierce Street, a distance of 2.2 miles. In addition, the work will include cement concrete sidewalks along the westerly side of Main Street with granite curb along both sides of Main Street. The work also includes rebuilding drainage structures (drainage structure sediments will be removed and disposed). Sanitary structures will also be adjusted and rebuilt. Hydrants that conflict with new sidewalk locations will be relocated.
|