| Project Description: |
MILFORD- SIGNALIZATION & GEOMETRIC IMPROVEMENTS, ROUTE 109 (MEDWAY STREET)/ROUTE I-495 RAMPS
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $911,617.18 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||