Project Description:
|
BROCKTON- BRIDGE REPLACEMENT, B-25-060 (AVA), BARTLETT STREET OVER SALISBURY BROOK
The work under this contract consists of the demolition of the existing superstructure and partial
demolition of the substructure. The proposed structure is an integral abutment bridge
comprised of spread prestressed concrete box beam supported on steel piles. The proposed
work includes full depth roadway reconstruction in the immediate vicinity of the bridge
construction along with the removal and stacking of existing granite curbs, installation of new
granite curbing, reconstruction of driveway aprons and sidewalks, temporary and permanent
utility relocation, and all other as shown on the construction plans.
The roadway will be closed during the construction of the bridge and roadway approaches. A
detour will be in place during the construction, but access to local residences shall be
maintained at all times.
|