Project Description:
BROCKTON- BRIDGE REPLACEMENT, B-25-060 (AVA), BARTLETT STREET OVER SALISBURY BROOK
The work under this contract consists of the demolition of the existing superstructure and partial demolition of the substructure. The proposed structure is an integral abutment bridge comprised of spread prestressed concrete box beam supported on steel piles. The proposed work includes full depth roadway reconstruction in the immediate vicinity of the bridge construction along with the removal and stacking of existing granite curbs, installation of new granite curbing, reconstruction of driveway aprons and sidewalks, temporary and permanent utility relocation, and all other as shown on the construction plans. The roadway will be closed during the construction of the bridge and roadway approaches. A detour will be in place during the construction, but access to local residences shall be maintained at all times.
Location:
  • City of Brockton
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: Michael Papadopoulos
    Estimated Total Contract Cost: $1,080,522.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • B25060 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project