Project Description: |
MANSFIELD- BRIDGE REPLACEMENT, BR# M-03-014 SCHOOL STREET OVER AMTRAK
This project will result in the replacement of the School Street Bridge over the Amtrak Railroad in the same location, with improvements to the approach roadways. The vertical clearance of the bridge will be improved. The project also involves new granite curbing, new retaining walls, and pavement markings. A temporary traffic signal will be installed during construction.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Kimberley Sloan |
Estimated Total Contract Cost: | $3,889,817.30 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project has been advertised for construction bids. (as of 03/23/2002 ) |
|