| Project Description: |
DISTRICT 1- CONSTRUCTION OF 4 CHEMICAL STORAGE SHEDS AT MAINTENANCE DEPOTS
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | ![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project has been advertised for construction bids. (as of 07/20/1996 ) |
|