Project Description:
|
COLRAIN- BRIDGE REHABILITATION, BR# C-18-010 ROUTE 112 OVER NORTH RIVER
This project replaces the existing bridge over the North River. The new structure will be located on the same horizontal alignment. The proposed work includes the construction of a new bridge and reconstruction of approximately 160 meters of Route 112 and approximately 80 meters of Call Road, utility adjustment and utility pole relocation. The work shall consist of clearing, grubbing, excavating, grading, pavement construction, bridge demolition, bridge construction, dust control, erosion control, water control, storm drainage and all other work incidental to the completion of the project. The work shall include maintenance of signing of bridge closure and detour during construction.
|