Project Description: |
REVERE- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE 1A (NORTH SHORE ROAD) FROM GEN. EDWARDS BRIDGE TO BUTLER CIRCLE
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Other |
Project Manager: | |
Estimated Total Contract Cost: | $1,582,309.65 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|