Project Description: |
ORANGE- BRIDGE REHABILITATION, BR# O-03-008 ROUTE 122 (SOUTH MAIN STREET) OVER MILLERS RIVER
The work consists of repairing the substructure, and replacing the bridge deck structure and the roadway approaches. Incidental work includes extending a ductile iron water line, and replacing the existing railing with a new vehicle barrier/pedestrian railing on Water Street.
|
Location: |
|
Resident Engineer: | William Whiteman |
Construction Contract Value: | $2,251,420.00 |
Construction Bid Price: | $2,154,184.00 |
Initial Construction Estimate: | $1,870,000.00 |
District: | District 2 |
Current Status: | Physical work completed. (as of 05/16/2006) |
|
Bridges
|
|
|
|
|