| Project Description: |
ORANGE- BRIDGE REHABILITATION, BR# O-03-008 ROUTE 122 (SOUTH MAIN STREET) OVER MILLERS RIVER
The work consists of repairing the substructure, and replacing the bridge deck structure and the roadway approaches. Incidental work includes extending a ductile iron water line, and replacing the existing railing with a new vehicle barrier/pedestrian railing on Water Street.
|
| Location: |
|
| Resident Engineer: | William Whiteman![]() |
| Construction Contract Value: | $2,251,420.00 |
| Construction Bid Price: | $2,154,184.00 |
| Initial Construction Estimate: | $1,870,000.00 |
| District: | District 2 |
| Current Status: | Physical work completed. (as of 05/16/2006) |
|