Project Description: |
MIDDLEBOROUGH- CONSTRUCTION OF PRE-ENGINEERED STORAGE FACILITY (ROUTE 28 MAINTENANCE DEPOT)
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Other |
Project Manager: | Mark Carmichael |
Estimated Total Contract Cost: | $200,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|